OUTPUT SHAFT INSTALLATION Tools Required

J 29837-A Output Shaft Support Fixture. See Special Tools.

Installation Procedure

OUTPUT SHAFT INSTALLATION Tools Required

Fig. 299: View Of Output Shaft Courtesy of GENERAL MOTORS CORP.

IMPORTANT: It is important to note that the input shaft may need a light tap to fully seat into position. If the input shaft is not completely engaged, the output shaft to input carrier retainer (661) will not seat.

1. Install the output shaft (687).

OUTPUT SHAFT INSTALLATION Tools Required

Fig. 300: Installing J 29837-A Courtesy of GENERAL MOTORS CORP.

INPUT CARRIER INSPECTION

OUTPUT SHAFT INSTALLATION Tools Required

Fig. 301: Input Carrier Pinion End Play Courtesy of GENERAL MOTORS CORP.

IMPORTANT: Check end play on each pinion.

1. Check the input carrier pinion end play. The end play must not exceed 0.61 mm (0.024 in).

2. Inspect the input carrier for pinion gear damage, proper pin stake and keystoned pinion gears. Pinions must rotate freely.

INPUT SUN GEAR BUSHING REPLACEMENT Tools Required

• J 8092 Universal Driver Handle - 3/4 in - 10

• J 34196-B Transmission Bushing Service Set. See Special Tools.

Removal Procedure

OUTPUT SHAFT INSTALLATION Tools Required

Fig. 302: Removing Input Sun Gear Front Bushing Courtesy of GENERAL MOTORS CORP.

Using J 34196-5 which is part of kit J 34196-B with J 8092 , remove the input sun gear front bushing (657) and rear bushing (659). See Special Tools.

OUTPUT SHAFT INSTALLATION Tools Required

Fig. 303: Installing Input Sun Gear Front Bushing Courtesy of GENERAL MOTORS CORP.

1. Using J 34196-4 which is part of kit J 34196-B with J 8092 , install the input sun gear front bushing (657). See Special Tools.

2. Using J 34196-6 which is part of kit J 34196-B with J 8092 , install the input sun gear rear bushing (659). See Special Tools.

Post A Comment